Process-1
- Select the Hose (as per customer specification).
- Cut the Hose in required sizes by cutting machine.
- Air Cleaning.
- Skive the outer cover of the Hose (if required).
Process-2
- Select the End Fitting (as per customer specification).
- Put the making/identification on outer side of the sleeve/socket.
- Push the fitting on the hose.
Process-3
- Crimping - Carryout the Assembling at Crimping machine (as per specified Crimp Chart).
Process-4
- Pressure testing.
- Flushing.
- Air Cleaning.
Process-5
- Pre-dispatch Inspection.
- Packing & Dispatch.